海角社区

尘鈥檃产辞苍苍别谤

Construction Start: McIntyre Medical - Renovation room 334

海角社区 has mandated Procova Inc听to carry out the following project: McIntyre Medical / 23-002听- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:听Wendy Rivera -听wendy.rivera [at] mcgill.ca

笔耻产濒颈茅: 22 Jan 2024

Construction Start: Wong Building - Space simulator

海角社区 has mandated Corenov Constructeurs Inc听to carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:听Mona Modarressi - mona.modarressi [at] mcgill.ca

笔耻产濒颈茅: 4 Dec 2023

Construction Start: Centennial Centre - Temporary classrooms

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

笔耻产濒颈茅: 30 Nov 2023

Construction Start: Parasitology Building - JELF Cestari

海角社区 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

笔耻产濒颈茅: 30 Nov 2023

Construction Start: Centennial Centre - JELF Gillung

海角社区 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

笔耻产濒颈茅: 20 Nov 2023

Construction start: Montreal Neurological Institute - Balustrade

海角社区 has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager: Johanne Guertin - Johanne.guertin [at] gph-inc.com

笔耻产濒颈茅: 8 Nov 2023

Construction Start: MNI, Residences, Currie Gym, Milton Gate and Burnside Parking - Infrastructure for new parking equipment

海角社区 has mandated Planit Construction to carry out the following project:听MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 海角社区 Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

笔耻产濒颈茅: 8 Nov 2023

Construction start: Macdonald Stewart Building (Mac campus) - JELF Roy

海角社区 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca

笔耻产濒颈茅: 19 Sep 2023

Construction start: Macdonald Stewart Building (Mac campus) - Basu Lab and Kitchenette

海角社区 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca

笔耻产濒颈茅: 19 Sep 2023

Construction start: Montreal Neurological Institute - Cyclotron aerial exhaust

海角社区 has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:听Eric Boutet, CIMA+ - eric.boutet [at] cima.ca

笔耻产濒颈茅: 19 Sep 2023

Construction start: McIntyre Medical Building - Seventh floor laboratories

海角社区 has mandated NR Brosseau to carry out the following project:听McIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -听Andrea.gore [at] mcgill.ca

笔耻产濒颈茅: 6 Jul 2023

Construction start: McIntyre Medical Building - Electrical room

海角社区 has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

笔耻产濒颈茅: 6 Jul 2023

Construction Start: Morrice Hall - Building envelope repairs

海角社区 has mandated Corenov Constructeurs to carry out the following project:听Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager and听Assistant Project Manager:

笔耻产濒颈茅: 27 Jun 2023

Construction Start: Strathcona Music - Renovation of percussion studios

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

笔耻产濒颈茅: 20 Jun 2023

Construction Start: McConnell Arena - Electrical upgrade

Please be advised that 海角社区 has mandated Concept P.V.R. Inc.听to carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) 鈥 Electrical upgrade

Description :

笔耻产濒颈茅: 20 Jun 2023

Pages

Back to top